| Prijs | USD $0.1~$0.15 per piece |
| MOQ | 5000 |
| Tijd om te bezorgen | 15 days |
| Merk | Microtemp |
| Plaats van Oorsprong | China |
| Certification | UL VDE PSE CCC |
| ModelNumber | G4A01 |
| Verpakkingsdetails | 500pcs per zak, 20000pcs per karton |
| Betalingsvoorwaarden | T/T |
| Leveringscapaciteit | 50K stukken per maand |
| Brand Name | Microtemp | ModelNumber | G4A01 |
| Certification | UL VDE PSE CCC | Plaats van Oorsprong | China |
| Minimumordehoeveelheid | 5000 | Price | USD $0.1~$0.15 per piece |
| Betalingsvoorwaarden | T/T | Leveringscapaciteit | 50K stukken per maand |
| Levertijd | 15 dagen | Verpakkingsdetails | 500pcs per zak, 20000pcs per karton |
| Puntnaam | thermische zekering, thermische scheiding, thermische verbinding | Artikelnummer. | G4A01 |
| Voltageclassificatie | 250V | Huidige Classificatie | 10A |
| TF | 66~240 Graad | Opzettend Type | as leaded |
| Slagtype | Één schoot verrichting | zaaktype: | metaal |
| UL vermeld | Ja | VOLGZAME ROHS | Ja |
| Vrij halogeen | Ja | MPQ | 500PCS |
| MOQ | 5000pcs |
G4A01 de thermische Zekering van Microtemp TCO van verbindings Lange Lood voor Temperatuurbescherming
MICROTEMP thermische Cutoffs wordt ontworpen voor thermische bescherming afgesneden elektro
Productomschrijving
| Punt | thermische zekering, thermische scheiding, thermische verbinding |
| Lichaam Tyle | Metaal |
| Lood Dia | 1mm |
| Loodlengte | zie lijst 3 |
| Huidige Classificatie | 10A@250VAC |
| Opzettend Type | as leaded |
| Lichaam Dia | 4mm |
| Lichaamslengte | 14.7mm |
| Certificatie | UL VDE |
Specificatie
| Tf ºC | G4A01 | Th ºC | Tm ºC |
| 72 | G4A01072C | 57 | 100 |
| 73 | G4A01073C | 58 | 100 |
| 77 | G4A01077C | 62 | 300 |
| 84 | G4A01084C | 69 | 220 |
| 91 | G4A01091C | 76 | 300 |
| 93 | G4A01093C | 78 | 300 |
| 98 | G4A01098C | 83 | 300 |
| 104 | G4A01104C | 89 | 200 |
| 110 | G4A01110C | 95 | 240 |
| 117 | G4A01117C | 102 | 240 |
| 121 | G4A01121C | 106 | 300 |
| 125 | G4A01125C | 110 | 185 |
| 128 | G4A01128C | 113 | 205 |
| 134 | G4A01134C | 119 | 205 |
| 141 | G4A01141C | 126 | 205 |
| 144 | G4A01144C | 129 | 300 |
| 152 | G4A01152C | 137 | 205 |
| 158 | G4A01158C | 143 | 240 |
| 167 | G4A01167C | 152 | 210 |
| 172 | G4A01172C | 157 | 310 |
| 184 | G4A01184C | 169 | 240 |
| 190 | G4A01190C | 175 | 350 |
| 192 | G4A01192C | 177 | 210 |
| 205 | G4A01205C | 190 | 310 |
| 216 | G4A01216C | 200 | 450 |
| 229 | G4A01229C | 200 | 450 |
| 240 | G4A01240C | 200 | 450 |
| 257 | G4A01257C | 220 | 470 |
Afmeting
De loodlengte kan worden aangepast
Elektroclassificaties
| Reeks | G4 | G5 | |
| Bureau | Weerstand biedend | Aanleidinggevend | Weerstand biedend |
| UL/CSA | 21A/240VAC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | 14A/120VAC | 25A/120VAC | |
| 15A/120AC | 21A/240VAC | ||
| 5A/24VDC | 20A/277VAC | ||
| VDE | 10A/250VAC | 8A/250VAC | 20A/250VAC |
| CCC | 5A/24VDC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | |||
| PSE-JET | 10A/250VAC | 15A/250VAC | |
Standaardpakket
500pcs per zak, 20000pcs per karton
Het verschepen Termijn:
EXW, DDU, DDP, C&F, FOB
Verzendwijzen:
Internationale Uitdrukkelijk, door de Lucht, door Overzees
G4A01 de thermische Zekering van Microtemp TCO van verbindings Lange Lood voor Temperatuurbescherming
G4A01 de thermische Zekering van Microtemp TCO van verbindings Lange Lood voor Temperatuurbescherming



